Incumbent water company v undertaker
The Water Bill Glossary: water terms was published by the Department for Environment, Food and Rural Affairs in November 2013. It defines the incumbent water company as ‘The water and/or sewerage undertaker that holds the de facto monopoly to provide services to premises in its area of appointment. It is also responsible for maintaining and operating the public water supply and/or sewerage systems. Although “insets” are also undertakers, the term “incumbent” does not include inset appointees for the purpose of describing the competitive market for providing services to new developments. However, inset appointees may be considered as incumbents in the context of the water supply and sewerage licensing regime because non-household customers will be eligible to switch suppliers in the reformed retail market’.
The term “incumbent water company” has taken the place of the term “undertaker” (also sometimes referred to as statutory undertaker), which is a term defined by the Water Bill Glossary as ‘A company who has statutory powers and duties to supply water and/or sewerage services to premises within an appointed geographical area under the Water Industry Act 1991. These are the incumbent water companies and inset appointees. The undertaker has complete control of the water supply and/or sewerage system in its appointment area. Licensees must therefore “use” their networks in order to serve or supply customers.’
There are both English and Welsh undertakers. An English undertaker is ‘an undertaker whose appointment area is wholly or mainly in England’ while a Welsh undertaker is ‘an undertaker whose appointment area is wholly or mainly in Wales.’ In both cases, undertakers are generally appointed on river basin catchments rather than political boundaries, so some English undertakers have appointment areas that extend into Wales while some Welsh undertakers have English customers.
See also: Statutory undertaker.
NB Water Bill, Glossary: water terms, published by the Department for Environment, Food and Rural Affairs in November 2013, describes the incumbent water company as: ‘The water and/or sewerage undertaker that holds the de facto monopoly to provide services to premises in its area of appointment. It is also responsible for maintaining and operating the public water supply and/or sewerage systems. Although “insets” are also undertakers, the term “incumbent” does not include inset appointees for the purpose of describing the competitive market for providing services to new developments. However, inset appointees may be considered as incumbents in the context of the water supply and sewerage licensing regime because non-household customers will be eligible to switch suppliers in the reformed retail market.’
Where an inset appointee or inset is: ‘A company that replaces the undertaker for a specific geographic area within the area of an existing undertaker. This usually happens where the customers are “unserved” (such as on a new development) or qualify as large users (i.e. they expect to use more than 50Ml in England or 250Ml in Wales – for example a paper mill). The inset regime is sometimes known as new appointments and variations (NAVs). However, the term “NAV” also refers to a variation of the appointment area of an incumbent water company, for example when incumbent water companies agree to change the boundaries between them.’
[edit] Related articles on Designing Buildings
- Drinking Water Inspectorate DWI.
- Ofwat.
- Statutory undertaker.
- Water company.
- Water consumption.
- Water Industry Act 1991.
- Water Industry Approved Plumbers Scheme WIAPS.
- Water Regulations Advisory Scheme WRAS.
- Water Supply (Water Fittings) Regulations 1999.
- Water transfers and interconnections.
- Water undertaker.
[edit] External references
- Department for Environment, Food and Rural Affairs, The Water Bill Glossary: water terms, November 2013.
Featured articles and news
HSE simplified advice for installers of stone worktops
After company fined for repeatedly failing to protect workers.
Co-located with 10th year of UK Construction Week.
How orchards can influence planning and development.
Time for knapping, no time for napping
Decorative split stone square patterns in facades.
A practical guide to the use of flint in design and architecture.
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from construction and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.